- Algeciras Port, Cádiz
The design consists of a perpendicular section to the east, a 413-m separation from the dock and a depth ranging from 28 m in the southern end to 43 m in the northern end. ACCIONA’s Kugira floating dock was used to build this sea wall, featuring the world's largest reinforced concrete caisson measuring 66.85 m in length, 24.6 m in width and 34 m in height.
ACCIONA's extensive experience and the use ofcutting-edge technological resources have made it possible to execute benchmark projects both nationally and internationally.
Canada's largest infrastructure project
The City of Toronto Deep Lake Water Cooling (DLWC) system is the world’s largest cooling solution of its kind. The system was built by ACCIONA Infrastructures to offer a sustainable, alternative source of air conditioning for downtown Toronto.