- New Container Base at the East Dock
This project consisted of the construction of a mooring line approximately 320 m long, with a 16-m draft depth, running from the current ramp of the Bufadero Container Base, following an approximately parallel alignment with the current wharf of the eastern container terminal.
Canada's largest infrastructure project
The City of Toronto Deep Lake Water Cooling (DLWC) system is the world’s largest cooling solution of its kind. The system was built by ACCIONA Infrastructures to offer a sustainable, alternative source of air conditioning for downtown Toronto.