- ACCIONA
- Projects
- Construction
- Port and Hydraulic Works
- New Oza Dock
This project consisted of the construction of a fishing dock formed by a 1,064-m long breakwater, in three alignments. The inside breakwater, which contains a 6-m deep and 1,083-m long caisson quay; a 167-mlong external dike; 200 m of artificial beach between the outer sea wall and the "Talleres Valiña Lavandeira" franchise, with a 20-m minimum width of dry beach; and the foundations (dredging and pavement) for the future Altura and Bajura jetties, both 6 m deep and 200 m and 150 m long respectively.
Canada's largest infrastructure project
The City of Toronto Deep Lake Water Cooling (DLWC) system is the world’s largest cooling solution of its kind. The system was built by ACCIONA Infrastructures to offer a sustainable, alternative source of air conditioning for downtown Toronto.
View ACCIONA Social Networks