- ACCIONA
- Projects
- Construction
- Port and Hydraulic Works
- Sagunto South Wharf
The project involved the construction of a wharf with a length of 880 m, a depth of 17.50 m and a width of 16.75 m, using precast reinforced concrete caissons. In addition to the dredging of the foundations, the dredging operations included the inner harbour of the Port of Sagunto, approximately 5 million m3.
ACCIONA Infraestructuras awarded this project one of the Annual Project Management Awards; these awards recognize excellence in different fields related to quality, occupational risk prevention, technology, etc.
Canada's largest infrastructure project
The City of Toronto Deep Lake Water Cooling (DLWC) system is the world’s largest cooling solution of its kind. The system was built by ACCIONA Infrastructures to offer a sustainable, alternative source of air conditioning for downtown Toronto.
View ACCIONA Social Networks