    Veracruz Shipyards

    In the eighties, a shipyard was built which included a lay-up berth and a dry dock at the Port of Veracruz, in Mexico, measuring 205 metres long, 30 metres wide and 7 metres high, the largest in the country and the time.

    The construction of the shipyard was started in 1979 and included a dry dock as well as a lay-up berth. The project was completed in 1982, becoming the first heavy naval construction centre in Mexico.

    The infrastructure, the first of its kind in Mexico, paved the way for the production of new ships and more vessels, as well as major naval repairs.

    General Information

    Location
    Veracruz, Veracruz (Mexico)
    Contract type
    Construction
    Infrastructure
    205 m long, 30 m wide and 7 m high
    Year of project completion
    1982

    Image Gallery

    discover other flagship projects

    Site C Clean Energy Project

    Fort St. John, British Columbia (Canada)

    Canada's largest infrastructure project

    Deep Lake Water Cooling System

    Ontario (Canada)

    The City of Toronto Deep Lake Water Cooling (DLWC) system is the world’s largest cooling solution of its kind. The system was built by ACCIONA Infrastructures to offer a sustainable, alternative source of air conditioning for downtown Toronto. 

    Move up