- ACCIONA
- Projects
- Construction
- Railways and Tunnels
- High-Speed Rail: Seville-Cádiz (Bahía Sur subsection)
The new line has two general tracks with a distance between axes of 4.3 m and a platform width of 13.3 m. The project was completed in December 2008.
Design and construction of the high-speed urban train in San Juan, running from Rio Bayamón via Centro Médico to Villa Nevarez and Hato Rey.
The longest tunnel excavated from a single entry point and the ninth longest in the world.
View ACCIONA Social Networks