    La Malata Land Outfall

    The project can be divided into two large parts: Pumping and load breaking, land outfall 

    The pumping system consists of a 102-m trench containing two 1,200-mm cast-iron pipes that convey the water to the inlet of the land outfall. At this point, a large load breaking inspection chamber is installed, such that from this point, the water flows by gravity through the outfall, which has a length of 7,344 m and an internal diameter of 3 m. The tunnel excavation was performed with a tunnel boring machine (TBM).

    The upper part of the chamber will be developed to create a recreational area for urban use.

    General Information

    Location
    Ferrol, La Coruña, Spain
    Contract type
    Construction
    Infrastructure
    7,343-m long tunnel of 3 metres in diameter and a slope of 1.5 m x 1,000 m
    Year of project completion
    2008

    Image Gallery

    discover other flagship projects

    San Juan de Puerto Rico Urban Train

    San Juan de Puerto Rico (Puerto Rico)

    Design and construction of the high-speed urban train in San Juan, running from Rio Bayamón via Centro Médico to Villa Nevarez and Hato Rey.

    Pajares Tunnels, León-Asturias High-Speed Rail Line

    León-Asturias (Spain)

    The longest tunnel excavated from a single entry point and the ninth longest in the world.

    Move up