- ACCIONA
- Projects
- Construction
- Railways and Tunnels
- Madrid- Seville High-Speed Rail
Designed for 300 km/h operating speed and featuring the most advanced safety and communication systems at the time of commissioning. This project featured over 470 km of dual standard gauge track for freight and passenger lines.
ACCIONA executed 160 km of dual track, including two 1.2-km long incrementally launched viaducts.
Design and construction of the high-speed urban train in San Juan, running from Rio Bayamón via Centro Médico to Villa Nevarez and Hato Rey.
The longest tunnel excavated from a single entry point and the ninth longest in the world.
View ACCIONA Social Networks