All stations are pile-supported elevated structures. The construction included foundations, reinforced concrete works, structural and architectural sidewalks, footbridges, links to the existing subway, new subways, elevated walkway systems, E&M signalling installation and architectural finishing works.
The majority of the viaduct spans were constructed using precast segmental methods and a further five special spans were constructed using free balanced cantilever methods.
Design and construction of the high-speed urban train in San Juan, running from Rio Bayamón via Centro Médico to Villa Nevarez and Hato Rey.
The longest tunnel excavated from a single entry point and the ninth longest in the world.