The main feature of this project was the construction of two lines with a total length of 32 km and 25 stations, such that 40% of the developed area or area suitable for development to be located at a distance of less than one kilometre from any of the system's stations.
Line A runs through the city, from Niquia to Itagüi, a distance of 23.22 km, of which 16.72 km are at grade and 6.50 km are built as a viaduct. The project was completed in March 1997.
Design and construction of the high-speed urban train in San Juan, running from Rio Bayamón via Centro Médico to Villa Nevarez and Hato Rey.
The longest tunnel excavated from a single entry point and the ninth longest in the world.