- ACCIONA
- Projects
- Construction
- Railways and Tunnels
- Murcia Tram
ACCIONA led the project design, the design and accessibility of stops, platforms and furniture, as well as the infrastructure solution and the mechanism for tram and road traffic coordination.
Design and construction of the high-speed urban train in San Juan, running from Rio Bayamón via Centro Médico to Villa Nevarez and Hato Rey.
The longest tunnel excavated from a single entry point and the ninth longest in the world.
View ACCIONA Social Networks