- ACCIONA
- Projects
- Construction
- Railways and Tunnels
- Trambaix Tram
This system connects the municipalities of Barcelona, Hospitalet and Baix Llobregat, and includes a total of 29 stations, with connections to Metro lines 3 and 5, and two other suburban train stations. The fleet consists of nineteen 32.5-m long carriages with a capacity for 230 passengers.
The project involves the design, construction of civil works, vehicles and systems, financing, operation and maintenance, as well as the provision of rolling stock. Payments are based on an availability mechanism until the project is turned back over in 2032.
Design and construction of the high-speed urban train in San Juan, running from Rio Bayamón via Centro Médico to Villa Nevarez and Hato Rey.
The longest tunnel excavated from a single entry point and the ninth longest in the world.
View ACCIONA Social Networks