    A-63 Divided Highway: Grado-Doriga

    Length of the section: 4.217 km. Some unique features worthy of mention are the El Fresno tunnels, 949 m in length on the right-hand lane and 923 m in length on the left-hand lane. The section includes the Dóriga junction.

    General Information

    Location
    Grado-Dóriga, Asturias, Spain
    Contract type
    Construction
    Infrastructure
    10 structures; 1 viaduct, 3 overpasses, 6 underpasses, as well as 2 tunnels, totalling 1,892 m in length
    Year of project completion
    2004

    Image Gallery

    discover other flagship projects

    The Rt. Hon. Herb Gray Parkway

    Windsor, Ontario (Canada)

    The Rt. Hon. Herb Gray Parkway is part of the proposed plan to connect Highway 401 in Ontario to Interstate 75 in Michigan, by way of a new Canadian inspection plaza and bridge crossing being constructed by the Federal Government in West Windsor. 

    New Walterdale Bridge

    Edmonton, Alberta (Canada)

    The City of Edmonton wishes to undertake the replacement of the existing two lane Walterdale Bridge with a new three lane bridge. The new Walterdale is an innovate bridge with pedestrian facilities including a multi-use trail on the east side and a sidewalk on the west side. 

    Move up