- ACCIONA
- Projects
- Construction
- Roads, Bridges and Special Structures
- Izbor Viaduct
The route passes through geotechnically complex terrain, where there are many active landslides which have made it necessary to carry out a whole range of geotechnical stabilization measures; it also has a very rugged topography, making it necessary to build six viaducts of different kinds, adapted in each case to the features of the terrain.
The Ízbor-Vélez de Benaudalla section of the Sierra Nevada Highway (A-44) runs through the province of Granada. This is a newly laid highway section measuring 10 km long, with six viaducts of different types, which together make up a total of 2,700 m in length and 5 million m3 of excavation.
The Rt. Hon. Herb Gray Parkway is part of the proposed plan to connect Highway 401 in Ontario to Interstate 75 in Michigan, by way of a new Canadian inspection plaza and bridge crossing being constructed by the Federal Government in West Windsor.
The City of Edmonton wishes to undertake the replacement of the existing two lane Walterdale Bridge with a new three lane bridge. The new Walterdale is an innovate bridge with pedestrian facilities including a multi-use trail on the east side and a sidewalk on the west side.
View ACCIONA Social Networks