- ACCIONA
- Projects
- Construction
- Roads, Bridges and Special Structures
- Toluca Airport Boulevard Intersection
The intersection eases traffic flow between Airport Boulevard and the Toluca-Naucalpan Federal Highway, a key area in the Toluca's metropolitan area.
Works on the first phase started in April 2014, and it was turned over in December of the same year. The project, with a length of 3,500 metres, facilitates traffic flow in the area with a view to reducing travel time and costs.
The project included construction of dirt roads, drainage works, foundations and structures (vehicle bridge, mechanically stabilized walls), asphalt course, horizontal and vertical signage, as well as other ancillary works.
The Rt. Hon. Herb Gray Parkway is part of the proposed plan to connect Highway 401 in Ontario to Interstate 75 in Michigan, by way of a new Canadian inspection plaza and bridge crossing being constructed by the Federal Government in West Windsor.
The City of Edmonton wishes to undertake the replacement of the existing two lane Walterdale Bridge with a new three lane bridge. The new Walterdale is an innovate bridge with pedestrian facilities including a multi-use trail on the east side and a sidewalk on the west side.
View ACCIONA Social Networks