- ACCIONA
- Projects
- Construction
- Roads, Bridges and Special Structures
- Villahermosa Bypass
The highway, with a total length of 5.5 km, will contribute to facilitating traffic flow between the centre of the country and the Yucatan Peninsula.
Located in the state of Tabasco, the Villahermosa Bypass was completed in 24 months, and was executed in the sections spanning from kilometre 0+800 to kilometre 2+300 and from kilometre 10+000 to kilometre 14+000.
Different junctions were built, including Loma de Caballo, as well as the Reloj and Aguacero Bridges. The work helps to reduce traffic congestion in the urban area of the city of Villahermosa, diverting vehicle traffic, and connects the centre and the south of the country.
The Rt. Hon. Herb Gray Parkway is part of the proposed plan to connect Highway 401 in Ontario to Interstate 75 in Michigan, by way of a new Canadian inspection plaza and bridge crossing being constructed by the Federal Government in West Windsor.
The City of Edmonton wishes to undertake the replacement of the existing two lane Walterdale Bridge with a new three lane bridge. The new Walterdale is an innovate bridge with pedestrian facilities including a multi-use trail on the east side and a sidewalk on the west side.
View ACCIONA Social Networks