    Empalme Power Plant Transmission Lines

    The Federal Electricity Commission (Comisión Federal De Electricidad or CFE in Spanish) awarded a contract to transport energy generated at Empalme II power plant to the Mexican states of Sonora and Sinaloa.

    ACCIONA Industrial began to design and construct a 117-kilometre electrical grid in 2015 to transport energy generated at the Empalme II combined cycle power plant to the states of Sonora and Sinaloa.

    The project, awarded in the amount of 90 million U.S. dollars (about 85 million Euros) marks the first electrical grid construction project in Mexico awarded by CFE to ACCIONA. The electrical grid will consist of 117 kilometres of high-tension electrical wiring and four substations; it is expected to begin operations at the end of 2017.

    GENERAL INFORMATION

    Location: Mexico

    Client: CFE

    Infrastructure: 117 km of transmission lines and 4 substations

    Year construction started: 2015

    discover other flagship projects

    Tetra Pak Electrical Substation

    Madrid, Spain

    This project will facilitate an update to the electrical facility and ensure a safe and reliable supply of energy.

    Transmission Lines for El Cortijo Wind Farm

    Tamaulipas Mexico

    Construction of transmission line for El Cortijo wind farm in Tamaulipas in north-east Mexico.

    Move up