    Transmission Lines for El Cortijo Wind Farm

    ACCIONA began construction on the transmission line for El Cortijo wind farm in Tamaulipas in north-east Mexico. The plant, which has a total capacity of 168 MW, will be built by ACCIONA, and after commissioning the facility will generate electricity to provide for 350,000 homes in the area, while preventing 563,000 tonnes of CO2 emissions per year compared to coal-fired power plants.

    ACCIONA  began this project upon completion of the El Cortijo electrical substation and will end it with the Reynosa Airport electrical substation. 28.8 km of overhead lines will be built to operate at a nominal tension of 400 kW and a frequency of 60 Hz.

    The project will be performed in one phase and is expected to be completed by the end of November of this year.

    GENERAL INFORMATION

    Location: Tamaulipas Mexico

    Client: ACCIONA Energía

    Infrastructure: 28.8 km of overhead lines at a nominal tension of 400 kW and frequency of 60 Hz

    Year construction started: February 2017

    discover other flagship projects

    Tetra Pak Electrical Substation

    Madrid, Spain

    This project will facilitate an update to the electrical facility and ensure a safe and reliable supply of energy.

    Empalme Power Plant Transmission Lines

    Sonora, Mexico

    The Federal Electricity Commission (Comisión Federal De Electricidad or CFE in Spanish) awarded a contract to transport energy generated at Empalme II power plant to the Mexican states of Sonora and Sinaloa.