    Empalme Power Plant Transmission Lines

    The Federal Electricity Commission (Comisión Federal De Electricidad or CFE in Spanish) awarded a contract to transport energy generated at Empalme II power plant to the Mexican states of Sonora and Sinaloa.

    ACCIONA Industrial began to design and construct a 117-kilometre electrical grid in 2015 to transport energy generated at the Empalme II combined cycle power plant to the states of Sonora and Sinaloa.

    The project, awarded in the amount of 90 million U.S. dollars (about 85 million Euros) marks the first electrical grid construction project in Mexico awarded by CFE to ACCIONA. The electrical grid will consist of 117 kilometres of high-tension electrical wiring and four substations; it is expected to begin operations at the end of 2017.

    GENERAL INFORMATION

    Location: Mexico

    Client: CFE

    Infrastructure: 117 km of transmission lines and 4 substations

    Year construction started: 2015

    discover other flagship projects

    Adriatic LNG Terminal Caisson

    Algeciras (Spain)

    Construction of a liquefied natural gas terminal at the Harbour Perimeter of Campamento (Algeciras), which was then tugged and installed in the north of the Adriatic Sea, off the coast of Venice (Italy).

    CT-TG Baja California II Phase 1

    Baja California (Mexico)

    This plant will cover peak and emergency demands in Baja California, and is the first of this kind of technology in the state.

    Move up